Employer Active

Posted 35 min ago

Experience

5 - 8 Years

Education

Bachelor of Technology/Engineering(Mechanical, Metallurgy)

Nationality

Any Nationality

Gender

Any

Vacancy

1 Vacancy

Job Description

Roles & Responsibilities

Responsible for the Process engineering of the Desalination, WTP, CCPP Project and in particular for the optimization of the technical solutions implemented.

Be familiar with Power Plant circulation cooling water system process and Hydraulic analysis. Process engineering design experience in Circulation Cooling Water detail design & Marine water in-taken will prefer.

Responsible for Power plant Once through Main cooling water mechanical system/process design including sea water intake, intake channel, sump design based on HI standard. Circulating water pump sizing, pipe sizing calculation. Open & closed sea water intake system design. Optimized intake, sump & pump configuration design/selection based on new bidding project tender requirement.

Develop optimized proposal through client specification review, preparation/ review of P&ID, equipment sizing, system layout, etc to win new projects.

Be familiar with developing the design of the cooling tower and condenser of power plant, Be able to make the optimization for them will be prefer.

Experience in CFD analysis & Physical model study of intake system will be preferred.

Provides expertise and technical support to the bidding support as necessary.

Sea water supply line and Power plant circulation cooling water trench simulation analysis experience will prefer.

Project bidding stage works: Review of Tender documents of new bidding project, come up with technical requirement breakdown, technical risk analysis, technical clarification/deviation with client, scope of work and terminal points, technical bidding criteria and assumptions, etc; Participant in the bidding Design Institute (DI) selection, project site visit; Coordinate with DI to prepare the Request for Quotation (RFQ), review OEM and Vendors’ technical proposal and Scope of Works (DOR); pre-bid & post-bid clarification with Client; Review equipment sizing, BOQ, performance guarantees prepared by DI, resolving the major technical issues, comparison and optimization of process equipment/system sizing & design; Organize internal pre-bidding review meeting; Review and finalize the technical bidding proposal. Draft the bidding experience summary after complete each project bidding works. Review of Tender documents to understand the scope of work, client specifications etc. and prepare technical offers, technical clarifications and list of deviations when required.

Responsible for review & preparation of proposal, basic and detail engineering for projects involving large size desalination, WTP & Combined Cycle Power plants.

Desired Candidate Profile

Bachelor’s degree in Mechanical /Chemical engineering from an accredited college or university.

Major in Process /Mechanical Engineering/ Power Plant Engineering, Chemical or water treatment engineering, Or other majors related to power/water plant.

Over 8 years of experience in BOP process and mechanical design of CCPP, Thermal Power, SWRO.

Employment Type

    Full Time

Department / Functional Area

Keywords

  • Design Review
  • Design Development
  • Prepare The Bidding Documents
  • CW Design

Disclaimer: Naukrigulf.com is only a platform to bring jobseekers & employers together. Applicants are advised to research the bonafides of the prospective employer independently. We do NOT endorse any requests for money payments and strictly advice against sharing personal or bank related information. We also recommend you visit Security Advice for more information. If you suspect any fraud or malpractice, email us at abuse@naukrigulf.com

SEPCOIII ELECTRIC POWER CONSTRUCTION CO. LTD. DMCC BRANCH

SEPCOIII Electric Power Construction Co. LTD. (hereinafter as SEPCOIII), founded in 1985, is a wholly-owned Grade A subsidiary of Power Construction Corporation of China, whose main operating models are EPCO, EPC, BOT, BOO and PMC in the construction of various types of power plants, including thermal, nuclear, gas, hydro, wind, transformer substation, biomass, photovoltaic, solar energy and sea water desalination. Its industrial layout involves electricity investment, design and consulting, equipment manufacturing and lease, international logistics and trade, unit commissioning and operation, real estate, leisure and travel, and it can provide a total solution including feasibility study, investment and loan, site selection and exploration, engineering and design, equipment supply and transportation, installation, commissioning, operation and maintenance. SEPCOIII, with total of over 5000 employees, has First Grade of Power Engineering Construction General Contract Qualification, Foreign Project Contracting & Operation Qualification, and Foreign Economic Cooperation Business qualification.

Read More

Wang

Unit No: 3902 JBC5 Plot No: JLT-PH2-W1A Jumeirah Lakes Towers, Dubai, United Arab Emirates PO Box: 117983, Dubai, United Arab Emirates (UAE)