Preliminary Technical Assessment, BoQ Preparation and Supervision

European Committee for Agricultural Training

Employer Active

Posted 21 hrs ago

Experience

1 - 7 Years

Job Location

Somalia - Somalia

Education

Any Graduation

Nationality

Any Nationality

Gender

Not Mentioned

Vacancy

1 Vacancy

Job Description

Roles & Responsibilities

In order to strengthen access to Toilets and promote Hygiene, CEFA is implementing rehabilitation/ Construction of VIP latrines in schools (4) and IDP camps(3). A total of 118 latrines constituting male, female and PWDs with installation of water, soap points and solar lighting.

Objectives of the Consultancy

  • The objective of the consultancy is to, in collaboration with CEFA technical team, assess the feasibility of rehabilitation/ construction works of pre-identified toilets within 4 schools and 3 IDPs camp in Jowhar District (Hirshabelle, Somalia);
  • Carry out water demand for the selected project vis a vis the potential sources of water;
  • Provide detailed design, drawings and BoQ for all proposed infrastructures
  • Conduct the supervision of the works implemented by the selected contractor(s).

Scope of Consultancy:

This assignment will be executed in Three (3) phases.

  • Phase one (1) will consist of technical/feasibility studies, survey and detailed design,
  • Phase two A (2A) will consist of supervision of the construction works.
  • Phase two B (2B) will consist of supervision / Inspection during the defect liability period (DLP)

Specific tasks to be undertaken by the Consultant in each per phase

Phase one (1) - Technical/feasibility studies, Survey and Detailed Design

This phase will be characterized by initial stakeholder engagements, Site visits for the assessment of the already identified sanitation facility to be constructed / rehabilitated in Johwar, preposition of design alternatives, topographical surveys and mapping of sites, detailed design, drawings and development of bill of quantities.

During Phase-1 of the assignment, the consultant will be expected to carry out the following tasks:

  • Engage relevant stakeholders and beneficiaries of targeted camps/ schools in the final site assessment;
  • The consultant will conduct technical feasibility of the proposed sites in terms of the rehabilitation / Construction Works needed;
  • Assess the beneficiary community water needs and propose interventions to satisfy the water demand (according to SPHERE standards);
  • Carry out topographical survey and mapping of the location of proposed infrastructure;
  • Conduct detailed design of the proposed infrastructure. Generate a detailed and accurate BoQ and Engineers estimate for the designed facilities; The design should include dedicated latrines for PWD as well as accessibility features
  • Identify negative Environmental and social impacts the proposed project may pose to the environment and community

Phase Two (2A) - Supervision of the construction works

During this phase the consultant shall perform the principal services of the engineer responsible for the supervision of the works in accordance with the FIDIC guidelines which will include but not limited to;

  • Represent the interests of CEFA under the Works Contract, in any manner related to the provisions of Works Contract and the proper execution thereof;
  • Review and comment or approve the Contractor's work program, method statements, proposals for materials sources, quality management plan, including testing laboratories and procedures for testing. Engineer s approval;
  • Be on site at all times during the construction and be present at critical stages of the works in particular during Site handover, setting out of works, materials delivery, concreting, testing and commissioning and to observe and report to the Client the progress and quality of the Contractor s work.
  • Check and establish that the Contractor mobilizes and supplies to the site all materials, equipment and machinery that have been committed in its bid, and ensure that all such items remain on site until their release has been authorized. Ensure that the Contractor properly records all equipment, materials and labour which have been supplied under the Contract.
  • Provide timely assistance and direction to the Contractor in all matters related to the interpretation or clarification of the Works Contract including drawings and specifications.
  • Issue instructions, in accordance with the authority specified in the Conditions of Contract, to Contractors, such that works can proceed expeditiously;
  • Monitor progress against program, instructing the Contractor to revise its program as necessary in order to meet due completion dates;
  • Ensure that the Works are executed in accordance with the drawings and that the quality of workmanship and materials is in compliance with the technical specifications. Evaluate and determine acceptability of substitute or equal materials and equipment proposed by the Contractor;
  • Liaise with communities and project affected persons of the works undertaken under the Project; Mediate on any conflict or request between the Client, contractor, Land owners or community members.
  • Review and comment on, or recommend approval of, Contractor s proposals for variations;
  • Prepare and submit reports on the progress of the Works, the Contractor's performance, quality of works and the final reports after testing.
  • Review and certify all Interim payment certificates submitted by the contractor before forwarding to CEFA Project Manager
  • Upon completion of the Works, carry out the necessary inspection, propose to CEFA /Project Engineer; a date for a joint inspection,
  • Prepare and issuance of the Certificate of Provisional Completion to the contractor upon completion of works;
  • Review and comment on or approve as-built drawings prepared by the Contractor;
  • Prepare and Submit Inception Report, Monthly Progress Reports and Final Report and any Special Reports as may be required by the project manager;
  • Perform all other tasks, not specifically mentioned above, but which are necessary and essential to ensure the successful supervision and control of all the construction activities, in accordance with the provision of condition for contract works.

Within 2 weeks after completion of the Works, the Consultant shall prepare a Final Report which will form a comprehensive record of the construction works including any changes or modification of designs, problems encountered and solutions, recommended operational procedures, expenses and variations. The Final Report shall include the following among others:

  • Financial and physical summary of the Works;
  • Summary of contract data and variation orders;
  • Engineering report;

Company Industry

Department / Functional Area

Keywords

  • Preliminary Technical Assessment
  • BoQ Preparation And SupervisionPreliminary Technical Assessment
  • BoQ Preparation And Supervision

Disclaimer: Naukrigulf.com is only a platform to bring jobseekers & employers together. Applicants are advised to research the bonafides of the prospective employer independently. We do NOT endorse any requests for money payments and strictly advice against sharing personal or bank related information. We also recommend you visit Security Advice for more information. If you suspect any fraud or malpractice, email us at abuse@naukrigulf.com

European Committee for Agricultural Training

The consultancy is part of the AICS funded project ARISE - Agriculture, Water Resources, Food Security, and Gender Equity for the Communities of Jowhar District, Hirshabelle, Somalia.

The overall objective of the action is to improve the living conditions of the most vulnerable segments of the population affected by the humanitarian emergency in Somalia.

The specific objectives of the action is to respond to the needs of the local population to improve their resilience and living conditions. Food security and the creation of livelihood opportunities, access to water and basic services (primarily nutritional and maternal-child health), and social protection networks remain a key aspect of this Initiative

In order to strengthen access to Toilets and promote Hygiene, CEFA is implementing rehabilitation/ Construction of VIP latrines in schools (4) and IDP camps(3).

Read More

https://reliefweb.int/job/4188066/preliminary-technical-assessment-boq-preparation-and-supervision-rehabilitationconstruction-vip-latrines-schools-and-idp-camps-johwar